Beginning at 9 am today (01/16/2023), the outside southbound lane of Bayshore Boulevard between South Edison Avenue and South Boulevard will be closed as the Tampa Water Department works to repair a water main break. Barricades and signs will be located in the area to assist with traffic flow. Please consider alternate routes and use caution when driving in the area. Modifications may be necessary during the course of the work.
The completion of the work with a return to normal traffic patterns is expected by 5 pm, Thursday, January 18. Work schedules are contingent upon weather conditions. The staff and crews of the Tampa Water Department appreciate everyone's patience during this time.
For additional information, contact:
Elias Franco, Water Operations Director
Office: (813) 274-8335
Cell: (813) 352-3607