Primary Details
Proposed 1100 LF of 14" FM on Kirby St and Proposed 900 LF of 8" FM on Egypt Lake Dr. Tie in existing Clearview FM with the Carlton Arms and Egypt Lake FM.
The force main replacement project will replace aging, deteriorated pipelines that have reached the end of their useful life and are susceptible to failure that can cause wastewater overflows that impact public health, safety, and the environment. The new force main will provide additional capacity for future development and lower energy costs of public and private pumping stations.