Primary Details
This project provides for the rehabilitation of the Dayflower pumping station to include replacement of existing pump bases, valves, and control panel.
The pumping station rehabilitation project will restore the station’s reliability by replacing the aging equipment and will include improvements to reduce vulnerability to extreme weather events. The station is a critical wastewater asset and failure of the station would result in a wastewater overflow that would impact the environment and pose a public health threat to the surrounding neighborhoods.