Bayshore Boulevard Sidewalk

25-C-00001 Sulphur Springs Pump Station Rehabilitation Design-Build

RFQ-25-C-00001

Posted Date:
Thursday, October 3, 2024
Updated:
Thu, 11/07/2024 - 02:07 pm
Submission Deadline:
BEFORE 2 P.M., Thursday, December 12, 2024
Pre Submission Conference Date:
1 PM on Monday October 21, 2024 at the pump station, located at 7902 N 13th Street
Pre Submission Conference Location:
1 PM on Monday October 21, 2024 at the pump station, located at 7902 N 13th Street
Addenda:
Documents:
  • RFQ (1.51 MB)