131st St and Florida Ave Collection System Rehabilitation

Primary Details

Description

This project includes the rehabilitation of approximately 5,810 linear feet of 8-inch to 30-inch diameter gravity sewers and the rehabilitation of 4 manholes.

Community Benefits

The collection system rehabilitation project will restore aging sewer pipes and manholes to restore their service life. Project impacts will be minimal compared to a collection system “open cut” replacement project since the rehabilitation methods are trenchless. The collection system rehabilitation will reduce pipeline failures and blockages that cause wastewater overflows that impact public health, safety, and the environment. Additional project benefits include reduction in leaks that allow ground water and stormwater runoff to enter the collection system and cause wastewater overflows, reduction in energy needed to treat and convey the additional wastewater flow caused by leaking pipelines/manholes and reduction in pipeline failures that cause roadway depressions and cave ins.

Contact Info

Contact Name
Charlie Lynch
Contact Phone
8132748916
Project ID
1002317
Department ID
WW1002317
Project Type
Status
Project Phase
Construction Fiscal Year
2022
Multi Year Project
No

Schedule and Costs

Project Phase
Planning
Design
Procurement
Construction
Closeout
Current Phase: Closeout
Planned Start Date
Planned End Date
Funding Source
PIPES
Estimated Cost
$770,000
Funded Project
Yes
Contract Number
21-C-00033
Location

28.065645209244, -82.463030311803

Project Location