Belmar Gardens Gravity Sewer Rehabilitation

Primary Details

Description

This project includes the rehabilitation of approximately 21,825 linear feet of 8-inch to 16-inch diameter gravity sewers and the rehabilitation of 88 manholes.

Community Benefits

The collection system rehabilitation project will restore aging sewer pipes and manholes to restore their service life. Project impacts will be minimal compared to a collection system “open cut” replacement project since the rehabilitation methods are trenchless. The collection system rehabilitation will reduce pipeline failures and blockages that cause wastewater overflows that impact public health, safety, and the environment. Additional project benefits include reduction in leaks that allow ground water and stormwater runoff to enter the collection system and cause wastewater overflows, reduction in energy needed to treat and convey the additional wastewater flow caused by leaking pipelines/manholes and reduction in pipeline failures that cause roadway depressions and cave ins.

Contact Info

Contact Name
Albert Calloway
Contact Phone
8136303902
Project ID
1002339
Department ID
WW1002339
Project Type
Project Phase
Construction Fiscal Year
2023
Multi Year Project
Yes
Council District
4
Neighborhood

Schedule and Costs

Project Phase
Planning
Design
Procurement
Construction
Closeout
Current Phase: Construction
Planned Start Date
Planned End Date
Funding Source
PIPES
Estimated Cost
$1,000,000
Funded Project
Yes
Contract Number
22-C-00006
Location

27.911643610795, -82.522470674048

Project Location