Primary Details
This project provides for a partial replacement of the Highland Oaks force main along Hunters Green Dr. The proposed force main is constructed using 1,200-ft of 12” PVC from the discharge manhole on Quail Creek Dr to the bridge, and 12” stainless steel for the bridge crossing.
The force main replacement project will replace aging, deteriorated pipelines that have reached the end of their useful life and are susceptible to failure that can cause wastewater overflows that impact public health, safety, and the environment.