University of Tampa Orange Glow

Temporary Lane Closure Channelside Dr to begin September 16, 2022 for Road Construction

Posted Date

Roads Affected: Channelside Dr (E Whiting St – E Washington St)

Dates: September 16, 2022 – September 19, 2022

Time: Daily (9 am to 4 pm)

Closure Type: NB lane closure

Permit: CWS-20-0000570

Contact: Albert Calloway, Chief Construction Engineer

City of Tampa Contract Administration / Construction Management

(813) 635-3400; albert.calloway@tampagov.net

The City recommends using alternative routes to avoid traffic congestion.

A high-resolution map with the City of Tampa’s suggested alternate routes can be found embedded below.