On April 11 at 9am, Wastewater Department crews will close the left lane on N 22nd St between E Palm Ave and E 9th Ave to begin repairs to a sewer lateral. Signage and traffic control devices will be located in the area to assist with rerouting and traffic flow. Motorists are advised to consider alternate routes and use caution when driving in the area. Safe access will be maintained for residences and businesses in the area.
The repair and restoration work are scheduled to be completed by Friday, April 14. Normal traffic patterns will then resume. A high-resolution map of the work area and lane merger is embedded below. Work schedules are contingent upon weather conditions.
For additional information, please contact:
Eric Weiss, P.E., Director
(813) 274-8039
Eric.Weiss@tampagov.net