Floribraska Gravity Sewer CIPP Lining

Primary Details

Description

This project includes the rehabilitation of approximately 15,447 linear feet of 8-inch to 21-inch diameter gravity sewers and the rehabilitation of 61 manholes.

Community Benefits

The collection system rehabilitation project will restore aging sewer pipes and manholes to restore their service life. Project impacts will be minimal compared to a collection system “open cut” replacement project since the rehabilitation methods are trenchless. The collection system rehabilitation will reduce pipeline failures and blockages that cause wastewater overflows that impact public health, safety and the environment. Additional project benefits include reduction in leaks that allow ground water and stormwater runoff to enter the collection system and cause wastewater overflows, reduction in energy needed to treat and convey the additional wastewater flow caused by leaking pipelines/manholes and reduction in pipeline failures that cause roadway depressions and cave ins.

Contact Info

Contact Name
Charlie Lynch
Contact Phone
8132748916
Project ID
1002292
Department ID
WW1002292
Project Type
Status
Project Phase
Construction Fiscal Year
2022
Multi Year Project
No
Council District
5
Neighborhood

Schedule and Costs

Project Phase
Planning
Design
Procurement
Construction
Closeout
Current Phase: Closeout
Planned Start Date
Planned End Date
Funding Source
PIPES
Estimated Cost
$830,000
Funded Project
Yes
Budget Year
2022
Contract Number
21-C-00037
Location

27.970858220126, -82.454025991318

Project Location