On March 27 at 9:00 AM, a contractor for the Wastewater Department will be performing an emergency sanitary sewer repair that will temporarily close a segment of N Lois Avenue (between W Kennedy Blvd & North A Street). Signage and traffic control devices are set up to assist with rerouting traffic around the area. Traffic will resume normal flow once past the work site. Access will be maintained for residences and businesses in the area. Motorists are advised to consider alternate routes and use caution when driving in the area.
The repair and restoration of the work area are scheduled to be completed no later than close of business on Friday, April 5, 2024. Normal traffic patterns will then resume. A map of the work area and lane shifts is embedded below. Work schedules are contingent upon weather conditions. See all road closures at www.tampagov.net/RoadClosures
Contact: Albert Calloway, Construction Engineer
City of Tampa Contract Administration / Construction Engineering & Inspections
(813) 635-3400, Albert.Calloway@tampagov.net