Tampa Theatre from the Cheap Seats Merge Detail Vignette

Temporary Road Closures Channelside Dr, E 4th Ave, E 3rd Ave, E 2nd Ave & N Avenida Republica de Cuba/N 14th St to begin April 29, 2024 for Road Construction (Gas Worx)

Posted Date

TRAFFIC ADVISORY — Road Construction (Gas Worx)

Roads Affected:

  • Channelside Dr (SR 60 – Nuccio Pkwy)
  • E 4th Ave (Nuccio Pkwy – N 15th St)
  • E 3rd Ave (Channelside Dr – N 15th St)
  • E 2nd Ave (Channelside Dr – N 15th St)
  • N Avenida Republica de Cuba/N 14th St (E 2nd Ave – E 6th Ave)

Dates: April 29, 2024 to May 30, 2025

Time: 24 hours

Closure Type:

  • Full Road Closure & Sidewalk Closures (both sides) – Channelside Dr
  • Full Road Closure & Sidewalk Closure (south side) – E 4th Ave
  • Full Road Closure & Sidewalk Closures (both sides) – E 3rd Ave & E 2nd Ave
  • Full Road Closure & Sidewalk Closure (west side) – N Avenida Republica de Cuba/N 14th St

Permit: ROW-24-0000322, ROW-24-0000714 & ROW-24-0000596

Contact: Debbie Herrington, P.E., Transportation ROW Engineer
City of Tampa Mobility Dept / ROW Permitting
(813) 274-3104, Debbie.Herrington@tampagov.net

 

road closure