This project provides for the design of a new traffic signal based on a safety-related signal warrant study.
The project will provide for the design and construction of two new mast arm traffic signals at the intersection of W Platt St and S Fremont Ave. As part of the project, minor geometric changes will be made as appropriate, including curb bulb-outs, new crosswalks, pedestrian signals, ADA-compliant ramps, detectable warning mats, and drainage modifications. The need for this project was identified by a safety study. The new signals should reduce severe right-angle traffic crashes and provide better transportation network connectivity for all modes.
Safety Enhancement
Contact Info
Schedule and Costs
Phase | Firm | Phase Cost | Funding Source | Scheduled Start | Scheduled Finish |
---|---|---|---|---|---|
Design | Element Engineering | $147,000 | City of Tampa | March 2021 | March 2022 |