Primary Details
Amendment 2 (aka GMP 4) to the FY20 CIP Water Main Improvements Design-Build Project_JFK Blvd project will improve the City of Tampa’s water distribution system by replacing the existing water mains. It will also improve our ability to serve a growing population. Approximately 18,550 Linear Feet of water mains ranging from 6 to 16 inches in diameter will be replaced and upgraded.
This project will replace the aging water mains in this area with new water mains, improving water pressure and water quality while reducing the number of service interruptions that might have been caused by main breaks or leakage.