Primary Details
The Gray Gables project will improve the City of Tampa’s water distribution system by replacing the existing water mains and increasing the capacity of the system. It will also increase capacity to serve a growing population. Approximately 12,722 Linear Feet of water mains ranging from 2 to 12 inches in diameter will be replaced and upgraded.
This project will replace the aging water mains in this area with new and larger diameter pipes, improving water pressure and water quality while reducing the number of service interruptions that might have been caused by main breaks or leakage.