Around Tampa Night Merged

Temporary Lane Closure: W Spruce St & N Clark Ave to begin April 1, 2024 for Utility Construction

Posted Date

TRAFFIC ADVISORY — Utility Construction

Roads Affected:   W Spruce St (N Clark Ave - N Lemans Blvd)

Dates: April 1, 2024 - April 19, 2024

Time: Daily (9 am - 4 pm)

Closure Type: Westbound Lane

Permit: CWS-24-0000381

On April 1 at 9:00 AM, a contractor for the Wastewater Department will begin Phase I of a force main replacement project that will temporarily close a segment of the westbound lane of W Spruce Street (between N Clark Ave - N Lemans Blvd). Signage and traffic control devices will be in the area to assist with rerouting traffic into the center turn lane. Traffic will resume normal flow once past the work site. Access will be maintained for residences and businesses in the area. Motorists are advised to consider alternate routes and use caution when driving in the area.

The repair and restoration of the work area are scheduled to be completed no later than close of business on Friday, April 19. Normal traffic patterns will then resume. A map of the work area and lane shifts is embedded below. Work schedules are contingent upon weather conditions. See all road closures at www.tampagov.net/RoadClosures  

Contact: Albert Calloway,  Construction Engineer
City of Tampa Contract Administration / Construction Engineering & Inspections
(813) 635-3400, Albert.Calloway@tampagov.net

road closure