Tampa Riverwalk at Night

Temporary Road Closure Channelside Dr to begin May 15, 2023 for Road Construction

Posted Date

TRAFFIC ADVISORY — Road Construction

Roads Affected: Channelside Dr (E Kennedy Blvd – S 12th St)

Dates: May 15, 2023 to May 19, 2023
Time: Nightly (9 pm to 6 am)

Closure Type: Full Road Closure
Permit: CWS-20-0000570

Contact: Albert Calloway, Chief Construction Engineer
City of Tampa Contract Administration / Construction Management
(813) 635-3400; albert.calloway@tampagov.net

See road closures at https://www.tampa.gov/roadclosures
See capital projects at https://www.tampa.gov/projects
See active permits at https://www.tampa.gov/permits

road closure