Ybor City

Road Closures

Traffic Advisory: Temporary Lane Closure N Blvd to begin August 14, 2024 for Building Maintenance

TRAFFIC ADVISORY -- Building Maintenance

Roads Affected: N Blvd (W Cass St - W Cypress St)

Dates: August 14, 2024 – August 16, 2024

Time: Daily (9 am – 4 pm)

Lane Closure on Columbia Drive between Arbor Place and Davis Boulevard

Beginning at 9 am today, the southbound lane of Columbia Drive will be closed between Arbor Place and Davis Boulevard while the Tampa Water Department repairs a water main break. Barricades and flaggers will be located in the area to assist with rerouting and traffic flow.

Full Road Closure on North Highland Avenue at the intersection of West Giddens Avenue

North Highland Avenue is now closed at the intersection of West Giddens Avenue while the Tampa Water Department repairs a water main break. Barricades and signs are located in the area to assist with traffic flow. Please use caution when driving in the area.

Lane Closure on East Davis Boulevard between Adalia Avenue and Bosphorous Avenue

The outside southbound lane on East Davis Boulevard is now closed between Adalia Avenue and Bosphorous Avenue while the Tampa Water Department repairs a water main break. Barricades and signs are located in the area to assist with traffic flow. Please use caution when driving in the area.

Full Road Closure on East 17th Avenue at the Intersection of North 20th Street

East 17th Avenue is now closed at the intersection of North 20th Street while the Tampa Water Department repairs a water main break. Barricades and signs are located in the area to assist with traffic flow. Please use caution when driving in the area.

Temporary Lane Closure W Cypress St to begin August 12, 2024 for Building Construction

Roads Affected: W Cypress St (E Frontage Rd - N O’Brien St)

Dates: August 12, 2024 to March 31, 2025

Time: Daily (9 am - 4 pm)

Closure Type: Eastbound Lane Closure

Road Closure on E Lake Ave between N 33rd and N 31st Streets begins August 13 for Utility Construction

Starting August 13 at 9am, Wastewater Department crews are closing E Lake Ave between N 33rd and N 31st Streets to install a sewer lateral. Eastbound traffic detours will begin at N 34th Street and westbound traffic detours will begin at N 31st Street.

Temporary Road Closure E Twiggs St to begin August 16, 2024 for Utility Construction

Roads Affected: E Twiggs Street (N Nebraska Ave – N Meridian Ave)

Date: August 16, 2024 – August 19, 2024

Time: 24 hours

Closure Type: Full Road Closure - Phase 1B

UPDATE 1: Full Road Closure on North 22nd Street between East Genesee Street and East North Bay Street

Due to more extensive repairs needed to complete this work, North 22nd Street will continue to remain closed between East Genesee Street and East North Bay Street while the Tampa Water Department completes repairs from a previous water main break.

Traffic Advisory: Temporary Lane Closures N Howard Ave to begin August 13, 2024 for Road Maintenance

TRAFFIC ADVISORY - Road Maintenance

Roads Affected: N Howard Ave (W Kennedy Blvd – W Fig St)

Dates: August 13, 2024 – August 28, 2024

Time: 24 hours