Beginning at 9 am today (08/21/2023), the westbound lane on West Azeele Street will be closed between South Lois Avenue and South Hubert Avenue while the Tampa Water Department conducts maintenance on the water distribution system.
Road Closures
TRAFFIC ADVISORY —Utility Construction
Roads Affected: W Euclid Ave (Bayshore Blvd - S Waverly Ct)
Dates: September 1, 2023 to November 10, 2023
Time: 9am - 4pm
Closure Type: Lane (Westbound) and Sidewalk (North side)
Permit: ROW-23-0001235
TRAFFIC ADVISORY -- Roadway Construction
Roads Affected: W Sligh Ave (N Willow St – N Blvd)
Dates: August 21, 2023 to August 23, 2023
Time: 9am - 4pm
TRAFFIC ADVISORY -- Private Utility Construction
Roads Affected: S Boulevard (W Swann Ave – W DeLeon St)
Dates: August 17, 2023 to January 12, 2024
Time: 24 hours
TRAFFIC ADVISORY —Building Construction
Roads Affected: S Manhattan Ave (W Bay Ave - W Mango Ave)
Dates: August 17, 2023 to August 23, 2023
Time: 24 Hours
Closure Type: Full Road Closure and Sidewalk Closure (west side)
Permit: ROW-22-0000912
TRAFFIC ADVISORY— Private Utility Construction
Roadways Affected: N 40th St (E Yukon St – E Humphrey St)
Dates: August 17, 2023 – August 31, 2023
Time: Daily (9 am – 4 pm)
Beginning at 11pm tonight, Bayshore Boulevard will be closed between West Shell Point Road and Sanders Drive while the Tampa Water Department repairs a water main break. Barricades and signs will be located in the area to assist with traffic flow. Please use caution when driving in the area.
Starting at 9am on August 21, Wastewater Department crews will close a section of W Bay To Bay Blvd between S Clark and S Grady Avenues to install a sewer lateral. Signage will be installed directing motorists to merge into open lanes and assist with traffic flow.
Beginning at 9am today (08/15/2023), the outside southbound lane on North Himes Avenue will be closed between West Saint John Street and West Saint Conrad Street while the Tampa Water Department repairs a water main break.
Starting at 9am on August 14, Wastewater Department crews will close the southbound and northbound center lanes on S Manhattan Ave between Henderson Blvd and W Palmira Ave to replace a deteriorated manhole frame and cover.
- Tell us what was confusing, missing or inaccurate about this page.
- We will not reply to comments, use the Page Enhancement Request below if you want a formal reply.
- Do not submit any personal or sensitive information such as account numbers or names.