Amalie Arena

The Internal Audit Department released its Water Department Engineering Division, Audit 21-08


This information is 3 years 1 month old and may no longer be accurate.
Posted

The Water Department’s (Department) Engineering Division (ED) provides services to the Department’s other two divisions (Production and Distribution). The ED consists of the Design team and the Development Services team with a total of 41 staff. The report in its entirety can be viewed on Tampa.Gov.