South Himes Avenue is closed between West Marlin Avenue and West McElroy Avenue while the Tampa Water Department repairs a water main break. Barricades and signs are in the area to assist with rerouting and traffic flow. Please use caution when driving in the area.
Road Closures
TRAFFIC ADVISORY – Road Improvements
Roads Affected: N 11th St (E Washington St – E Whiting St)
Dates: January 17, 2023 – January 18, 2023
Time: 24 hours
Closure Type: Full Road Closure
Permit: ROW-22-0000147
TAMPA, FL (January 11, 2023) Beginning at 9pm tonight, the outside eastbound lane on W Fletcher Avenue will be closed between Edith St and North Boulevard while the Tampa Water Department repairs a water main break.
Beginning at 9am today, the outside westbound lane on West Kennedy Boulevard will be closed between North Hubert Avenue and North Manhattan Avenue while the Tampa Water Department repairs a water main break. Barricades and signs will be located in the area to assist with traffic flow.
Beginning at 9am today, West Swann Avenue will be closed between South Dale Mabry Highway and South Church Avenue as the Tampa Water Department repairs a water main break. Barricades and signs will be located in the area to assist with rerouting and traffic flow.
TRAFFIC ADVISORY — Special Event – Dr. Martin Luther King, Jr. Parade
Roads Affected:
Beginning at 9am today, East Floribraska Avenue will be closed between North Tampa Street and North Florida Avenue while the Tampa Water Department conducts maintenance on the water distribution system. Barricades and signs will be located in the area to assist with rerouting and traffic flow.
Beginning at 9am today, East Hanna Avenue will be closed between North 34th Street and North 36th Street while the Tampa Water Department repairs a water main break. Barricades and signs will be located in the area to assist with traffic flow.
TRANSPORTATION ADVISORY - For Immediate Release
For additional information, please contact: Eric Weiss, P.E., Director
(813) 274-8039; eric.weiss@tampagov.net
Partial Closure on W Morrison Ave between S MacDill Ave and S Marti St begins January 17 for Utility Construction
East Washington Street between North Tampa Street and North Ashley Drive has reopened following a water main break yesterday after this section was repaired ahead of schedule.
- Tell us what was confusing, missing or inaccurate about this page.
- We will not reply to comments, use the Page Enhancement Request below if you want a formal reply.
- Do not submit any personal or sensitive information such as account numbers or names.