Lane Closures on North Florida Avenue between East Hillsborough and East Comanche Avenues

Beginning at 9am today, both northbound lanes on North Florida Avenue will be closed between East Hillsborough and East Comanche Avenues while the Tampa Water Department repairs a water main break. Barricades and signs will be located in the area to assist with traffic flow.

Tentative Lane Closure at N Boulevard (W Sligh Ave - W Waters Ave) starting on 12/11/2023 for Road Construction

TRAFFIC ADVISORY – Road Construction

Roadways Affected: N Boulevard (W Sligh Ave - W Waters Ave)

Dates: December 11, 2023 – June 14, 2024

Time: Daily 7 am to 6 pm

Temporary Lane Closures N MacDill Ave & W Tampa Bay Blvd to begin June 13, 2024, for Roadway Construction

TRAFFIC ADVISORY —Roadway Construction

Roads Affected: 

  • N MacDill Ave (W Tampa Bay Blvd – W Aileen St)
  • W Tampa Bay Blvd (N Glen Ave – N Matanzas Ave)

Dates: June 13, 2024, to June 21, 2024

Traffic Advisory: Temporary Road Closures N Franklin St & E Harrison St to begin June 6, 2024 for Utility Construction

TRAFFIC ADVISORY—Utility Construction

Roadways Affected: N Franklin St (E Tyler St - E Royal St)

E Harrison St (N Franklin St – N Florida Ave)

Date: June 6, 2024 to June 21, 2024

Time: 24 hours

Traffic Advisory: Temporary Lane Closure E Madison St June 10, 2024 for Miscellaneous Improvements (Tree Trimming)

TRAFFIC ADVISORY -- Miscellaneous Improvements (Tree Trimming)

Roads Affected: E Madison St (N Meridian Ave - Channelside Dr)

Dates: June 10, 2024

Time: 9 am – 3 pm

Full Road Closure on N Ola Ave Between W Dr. Martin Luther King Jr. Blvd and W Virginia Ave

All lanes of North Ola Avenue will be closed between West Dr. Martin Luther King Jr. Boulevard and West Virginia Avenue while the Tampa Water Department repairs a water main break. Barricades and signs will be located in the area to assist with traffic flow.

Temporary Lane Closure N Howard Ave extended to June 4, 2024 for Utility Construction

TRAFFIC ADVISORY — Utility Construction

Roads Affected: N Howard Ave (W Grace St- W Nassau St)

Dates: April 8th, 2024 to June 4th, 2024

Time: Daily (9 am- 4 pm)

Temporary Lane Closures N 15th St to begin June 3, 2024, for Roadway Construction

TRAFFIC ADVISORY —Roadway Construction

Roads Affected: N 15th St (E 109th Ave – E Fowler Ave)

Dates: June 3, 2024, to June 17, 2024

Time: Daily (9am - 4pm)

Temporary Road Closure S Himes Ave Extended to July 19, 2024 for Road Construction

TRAFFIC ADVISORY – Road Construction

Roads Affected: 

Traffic Advisory: Temporary Lane Closure W Linebaugh Ave to begin February 26, 2024 for Utility Construction

TRAFFIC ADVISORY — Utility Construction

Roads Affected: W Linebaugh Ave (N Newport Ave - N Willow Ave)

Dates: February 26, 2024– September 30, 2024

Time: Daily (9 am – 4 pm)