TRAFFIC ADVISORY – Utility Construction
Roads Affected: E 7th Ave (N 15th St – N 16th St)
Dates: January 8, 2024 – January 9, 2024
Time: 24 hours
Closure Type: Full Road Closure
TRAFFIC ADVISORY – Utility Construction
Roads Affected: E 7th Ave (N 15th St – N 16th St)
Dates: January 8, 2024 – January 9, 2024
Time: 24 hours
Closure Type: Full Road Closure
TRAFFIC ADVISORY — Special Event – ReliaQuest Bowl Parade
Roads Affected:
Beginning at 9 am today (12/28/2023), the northbound lane on Bayshore Boulevard will be closed between Sanders Drive and West Shell Point Road while the Tampa Water Department repairs a water main break.
TRAFFIC ADVISORY — Miscellaneous Improvements
Roads Affected: Channelside Dr (E Washington St - E Kennedy Blvd)
Dates: January 9, 2024 – January 12, 2024 (Phase 2A)
Time: Nightly (11 pm to 5 am)
TRAFFIC ADVISORY -- Building Maintenance
Roadways Affected: N Marion St (E Twiggs St – E Zack St)
Dates: January 20, 2024
Time: 7 am – 4 pm
TRAFFIC ADVISORY -- Roadway Construction
Roads Affected: Nuccio Pkwy (E Palm Ave – Channelside Dr)
Dates: January 2nd, 2024 to January 9th, 2024
Time: 9am - 4pm
Beginning at 9 am today (03/11/2024), the outside northbound lane of North Florida Avenue will be closed between East 124th Avenue and East 127th Avenue as the Tampa Water Department returns to complete a more permanent restoration following earlier work to repair a water main break.
The outside eastbound lane on West Hillsborough Avenue is closed between Kelly Road and Town and Country Blvd while the Tampa Water Department repairs a water main break. Barricades and signs are located in the area to assist with traffic flow. Please use caution when driving in the area.
Beginning at 9 am today (12/21/2023), the outside eastbound lane on East Columbus Drive will be closed between North 36th Street and North 38th Street while the Tampa Water Department repairs a water main break. Barricades and signs will be located in the area to assist with traffic flow.
TRAFFIC ADVISORY – Road Construction
Roads Affected: Interbay Blvd (S Himes Ave – Interbay Ave)
Dates: January 2, 2024 – January 25, 2024
Time: 24 hours
Closure Type: Full Road Closure – Phase 2