Tampa Theatre

Stormwater Work Areas

Stormwater Operations schedules its work load through out the year.  This schedule is based on three work zones: North, Central and South.  Each Zone schedules work for each of the twelve months.  A visual representation of the overall schedule is available via Stormwater's Monthly Plan Work Areas (PDF 102.7 KB) map.

12 Work Areas