In the Design Phase, the project design is being completed and funding sources are identified.
22
Projects
30% Design Completion
30% Design Completion
West River District Multi-Modal Network and Safety Improvements BUILD Segments 1 - 6
Bike & Pedestrian Improvements / Complete Streets…
30% Design Completion
Twiggs St (Ashley Dr to Nebraska Ave)
Congestion Mitigation
30% Design Completion
Sligh Ave at 30th St
Complete Streets & Safety Improvements
30% Design Completion
Neighborhood Improvements- West Riverside Heights
Neighborhood Improvements- Resurfacing
30% Design Completion
MacDill Air Force Base Access Improvements (Interbay Blvd between West Shore Blvd and S. Bayshore Blvd)
Complete Streets & Safety Improvements
30% Design Completion
InVision Streetcar (Design Only)
Transit
30% Design Completion
Doyle Carlton Dr & Laurel St Intersection Improvements
Intersection Improvements
30% Design Completion
30th St (E Bougainvillea Ave to E Fowler Ave) Segment 2 (Resurfacing)
Complete Streets & Safety Improvements
30% Design Completion
24th Street (Hanna Ave to Sligh Ave)
Complete Streets & Safety Improvements
90% Design Completion
90% Design Completion
Sidewalks- Hubert St (W Cypress to W Main St)
Bike & Pedestrian Improvements
90% Design Completion
Platt St and Fremont Ave - Traffic Signal
Safety Enhancement
90% Design Completion
Hanna Ave (22nd St to 30th St)
Congestion Mitigation
90% Design Completion
Green Spine Cycle Track, Phase 2A
Bike & Pedestrian Improvements
90% Design Completion
Glen Ave Sidewalk and Safety Improvements (Green St to Beach St)
Bike & Pedestrian Improvements
90% Design Completion
El Prado Blvd. Complete Streets & Sidewalks (Omar Ave to Lois Ave; Lois Ave to Bayshore Blvd)
Complete Streets & Safety Improvements
90% Design Completion
Downtown Core Complete Streets (Tampa St, Florida Ave, and Brorein St Resurfacing)
Complete Streets & Safety Improvements
90% Design Completion
Commerce Palms Dr and Compton Dr
New Traffic Signal
90% Design Completion
Cleveland St and Rome Ave - Traffic Signal
Safety Enhancement
90% Design Completion
Cass St Bridge (#105502) Electrical/Mechanical Rehabilitation
Bridges & Seawalls
90% Design Completion
Brorein St Bridge (#105501) Phase 2 Mechanical/ Electrical Rehabilitation
Bridges & Seawalls
90% Design Completion
Brorein St Bridge (#105501) Phase 1 Structural Rehabilitation
Bridges & Seawalls
90% Design Completion
21st St and Palm Ave - Traffic Signal Replacement
End of Life Replacement