- BLD-Demo Pre-Construction Inspection
- BLD-Erosion and Sediment Control
- BLD-Driveway or Sidewalk Pre-Pour
- BLD-Above Grade Slab
- BLD-Steel Fireproofing
- BLD-Structural Steel Framing
- BLD-Firewalls
- BLD-Insulation – Ceilings
- BLD-Insulation – Walls
- BLD-Footer/Ufer Bond
- BLD-Foundation/Footer
- BLD-Framing
- BLD-Wall or Roof Sheathing
- BLD-Siding Pre-inspection
- BLD-Grade Beams/Spandrels
- BLD-On Grade Slab/Monolithic Slab
- BLD-Pilasters/Fill Cells/Columns
- BLD-Roof Dry-In
- ROF-Final
- BLD-Final Grading-Drainage
- BLD- Final
- ELE-Rough-In
- ELE-Underground Rough-In
- ELE-Electrical Power Release
- ELE-Footer/Ufer Bond
- ELE-Rough-In/Ceilings
- ELE-Rough-In/Walls
- ELE-Final
- MEC-Rough-In
- MEC-Pressure Test
- MEC-Final
- PLB-Rough-In
- PLB-Tub Set
- PLB-Pressure Test
- PLB-Sanitary Service
- PLB-Sewer
- PLB-Stormwater System
- PLB-Underground Rough-In
- PLB-Water Service
- PLB-Final
- FIRE-Rough-In
- FIRE-Functional Test
- FIRE-Final
For more detailed information on what to include on the plans, download the PDF version of this guide
Select an option below to obtain additional information about each stage in Commercial New Construction permit process
Application Guide
Fees
Plan Review
Inspections
RFC - Ready For Completion