
- BLD-Demo Pre-Construction Inspection
- BLD-Erosion and Sediment Control
- BLD-Driveway or Sidewalk Pre-Pour
- BLD-Above Grade Slab
- BLD-Steel Fireproofing
- BLD-Structural Steel Framing
- BLD-Firewalls
- BLD-Insulation – Ceilings
- BLD-Insulation – Walls
- BLD-Footer/Ufer Bond
- BLD-Foundation/Footer
- BLD-Framing
- BLD-Wall or Roof Sheathing
- BLD-Siding Pre-inspection
- BLD-Grade Beams/Spandrels
- BLD-On Grade Slab/Monolithic Slab
- BLD-Pilasters/Fill Cells/Columns
- BLD-Roof Dry-In
- ROF-Final
- BLD-Final Grading-Drainage
- BLD- Final
- ELE-Rough-In
- ELE-Underground Rough-In
- ELE-Electrical Power Release
- ELE-Footer/Ufer Bond
- ELE-Rough-In/Ceilings
- ELE-Rough-In/Walls
- ELE-Final
- MEC-Rough-In
- MEC-Pressure Test
- MEC-Final
- PLB-Rough-In
- PLB-Tub Set
- PLB-Pressure Test
- PLB-Sanitary Service
- PLB-Sewer
- PLB-Stormwater System
- PLB-Underground Rough-In
- PLB-Water Service
- PLB-Final
- FIRE-Rough-In
- FIRE-Functional Test
- FIRE-Final
For more detailed information on what to include on the plans, download the PDF version of this guide