View each step below to obtain additional information about each stage in Commercial Signs permit process
Application
- Commercial Miscellaneous / Signs
Fees
Do you want to get an estimate of your permit fee? Use this link to go to the Fee Calculator.
Document Review
-
Site Plan
- Proposed sign location with dimensions to property lines
- Standard Construction Details
-
Building Plan
- Elevations
- Sign Specifications including sign area calculations
- Design wind loads report
- Electrical connection information (if applicable)
- Foundation plans for free standing, attachments to building
-
Inspection
- ELE - Final
- BLD - Final
RFC - Ready for Completion
Use the Project Coordination Status Report (PCSR) on this page to get information on pending items like Open related permits, Open Conditions, Fees due and/or Inspections due to complete your project.
To see if your project qualifies for the Fast Pass-Same Day application, visit the Fast Pass page
Above information is provided as a guide. Additional information may be required, please consult with our Client Facilitation team at: csdhelp@tampagov.net