Application Guide:
Use this link to obtain information on minimum permit application filing requirements
Fees
Plan Review:
- Foundation Stabilization Plan (signed & sealed)
- Analysis Engineering Report (signed & sealed)
- Completed Engineering Report (signed & sealed)
Inspection:
- BLD-Final
See if your project qualifies for the Fast Pass-Same Day application
Above information is provided as a guide. Additional information may be required, please consult with our Client Facilitation team at: csdhelp@tampa.gov